Capacity of solution, no of people served, problem faced by customer, benefits of solution to customer. This off grid water pumping solution was implemented to supply the areas of Lodwar with water. The power system consists of solarisation of 7 boreholes.

The installed system consists of a 12kW SOLARWORLD PV array, 12kw SMA solar inverter, 3 X 6kw SMA battery inverters and an 87.36kwh HOPPECKE battery bank. The system will be powering the hospital as the primary power source replacing the national grid. The grid will be used as a back-up source.

DAVIS & SHRTLIFF LTD. DESIGNED, SUPPLIED AND INSTALLED 40NO. 60W SOLAR STREETLIGHTS FOR ALL THE COMMON AREA LIGHTING FOR THE SHOPPING MALL.

The Project was for solarization of existing boreholse at Bidibid refugee camp. Over 45NO. Boreholes Solarized, with additional RO unit, Pump house and aquatar for water distribution.

Capacity of solution, no of people served, problem faced by customer, benefits of solution to customer.
Capacity of solution, no of people served, problem faced by customer, benefits of solution to customer.
We Installed the 15kW solar grid connect system at ST. Jude International school Arusha, to supplement the UMEME power during the day and thus reduce the power bill.
THE SCHOOL HAS A POULATION OF 1,200 STUDENTS.
THE SYSTEM COMPRISED:
THE SYSTEM PERFORMS VERY WELL AND THE SCHOOL WAS ABLE TO REDUCE THEIR POWER BILL BY ABOUT 30% AND THE SYSTEM IS EXPECTED TO HAVE A ROI OF 3YEARS.

Capacity of solution, no of people served, problem faced by customer, benefits of solution to customer. The project was done in two phases. First phase was supply and Installation of 3,000Litres commercial solar hot water systems to two number blocks at the training centre. This was successfully commisioned in DEC 2017.